General technical specifications; The specific parameters, structure, and instal
General technical specifications; The specific parameters, structure, and installation requirements shall be subject to the corresponding product manual and actual working condition verification.
Answer directly

Before starting, confirm that the equipment is in a safe state: the protective cover, fasteners, base, coupling or belt are intact; High pressure hoses, fittings, spray guns, and nozzles are undamaged; The safety valve, pressure regulating valve, and pressure gauge are installed correctly. Check the oil level and quality of the crankcase, and confirm whether the transport oil plug has been replaced with a working oil plug with a ventilation structure during the first use.
Key technical specifications
Check water supply: clean water source, sufficient liquid level, clean filter, fully open inlet valve, suction hose not deflated, joint not leaking, medium temperature within allowable range. Confirm that the bypass or unloading circuit is unobstructed and the outlet valve position is correct. Automatic equipment should also be tested for low liquid level, low inlet pressure, emergency stop, and protective interlock.
After the initial start-up or maintenance, the air should be exhausted in a low pressure state, and the rotation direction should be confirmed by jogging before gradually increasing the speed and loading. Observe pressure gauge, current, noise, vibration, pump head leakage, and return water temperature. If the pressure cannot be stably established, do not repeatedly tighten the pressure regulating valve. Stop the machine to check the water supply, valve group, nozzle, and seal.
Pre launch checklist
Liquid supply side
The water tank level, water supply flow rate, and temperature meet the requirements;
The filter is clean and has sufficient flow capacity;
The inlet pipeline is short, the seal is reliable, and there is no folding or leakage;
The pump chamber and inlet pipeline have been filled with liquid and can be vented.
Pump and Drive
The oil level, oil product, and breathing/transportation plug status comply with the manual;
Couplings, belts, fasteners, and protective covers are intact;
After the first wiring or maintenance, the rotation direction has been checked by tapping;
Motor protection, grounding, and emergency stop are effective.
high-voltage side
Hoses, hard tubes, fittings, spray guns, and nozzles are undamaged;
The installation of pressure regulating/unloading and safety valves is correct;
The range and status of the pressure gauge are suitable;
There is no sealed or pressure relief protection at the exit.
Do not start
When there is no water or uncertain water supply, high-pressure hose bulging, oil emulsion, loose pump body, unclear rotation direction, missing protective cover, or safety valve isolated, it shall not be started.
Frequently Asked Questions
Can the pump be run dry for a short period of time to check the rotation direction?
Dry spinning should be avoided. Use the manufacturer approved jogging and filling methods to verify the rotation direction.
Do you need further selection or diagnosis?
Complete working conditions can be submitted through the CENTSEA official website. When there is insufficient information, fill in the measurement and operation records first, and do not directly guess the model or faulty parts.
The first start-up also requires checking the transportation status
Some pumps use transport sealing oil plugs when they leave the factory. Before formal operation, they must be replaced with working oil plugs with ventilation function according to the instructions, otherwise the crankcase pressure may be abnormal.
Before starting, it should be confirmed that the inlet valve is open, the pump chamber is reliably supplied with liquid, and the air is exhausted in the unloading or low-pressure state.
The inlet pressure gauge, outlet pressure gauge, and motor current should establish a baseline at the first start-up for subsequent maintenance comparison.
For the first power on, it is advisable to check the rotation direction by tapping. If there is a leak, abnormal noise, strong vibration, or abnormal current in the high-pressure pipeline, the machine should be stopped immediately, the pressure should be relieved, and the cause should be eliminated.
Engineering Tips
Make the checklist into a signed record, distinguishing between "each shift", "first start-up after maintenance", and "start-up after long-term shutdown", which is more reliable than verbal handover.
This article explains general technical principles. If specific equipment needs to be implemented, please check the corresponding product data sheet based on working pressure, flow rate, medium, temperature, liquid supply conditions, and operating system. Jinpump can assist in organizing selection inputs based on complete operating conditions, but the specific model and parameters should be based on the final confirmed data.
Etiqueta:
Anterior
Noticias relacionadas
Dirección de correo electrónico:
Línea directa:
Derechos de autor © Jinpu (Tianjin) Pump Industry Co., Ltd. Todos los derechos reservados
English
Deutsch
Русский
Español